Heather
Knoll Cluster Association
Board of Directors Meeting
June 12, 2017
The meeting held at Tim Schick’s (1223)
was called to order at 7:30 p.m.
Board Members present: Craig Downie, Tim
Schick, Bob Dilger, Lee Thompson and Petra Raymond.
Guests present: Fred Souk and Judy
Holmes
Minutes
m/ Bob s/ Craig The Minutes of May 17
were approved.
Financial
Reports
m/Tim s/ Craig The financial report for May was approved.
Street
Paving
Bob reported that ProPave
has agreed to accept the settlement of the street paving costs approved last
month by the board.
Investment
of Reserves
m/ Bob s/ Lee The Board approved putting $100,000 of
the roof reserve into a certificate of deposit.
Curb
Staining
The
Board reviewed the schedule for paint removal and staining of curbs. The work will be scheduled as weather
permits. Residents will be notified to keep their cars away of work area.
House
painting
Fred discussed concerns that he had
regarding the contractor who is painting his house. The concerns
were not with the painting but rather the contractor's lack of communication,
which had been resolved. The board also received an email from a homeowner who
was very satisfied with the contractor's work.
Mailbox
repair
Petra reported that patching and
repainting a rusted mailbox post was underway.
Erosion
abatement projects
The board reviewed progress on drainage
and erosion abatement projects. The work approved in May is partially complete.
Landscaping
The board discussed a resident’s request
that a tree behind 1204 be removed because it is damaging a patio. The resident
intends to renovate the patio. The board
reached a consensus that the resident should review the plans (including the
tree removal) with the Reston Association.
m/Bob s/ Tim The Board approved paying
Duff $200 to remove a dead tree on cluster property along Woodbrook
Lane.
There was a related discussion regarding
contractor invoices and the need for the name of the contractor to match the
name on checks being issued.
m/Lee s/ Bob, The Board approved the
payment of $20 to Duff for removal of a tree limb, which was beyond the scope
of previously approved work. The
project, which had been approved for up to $400, only cost $330, including the
extra $20.
The next meeting was scheduled for 7:30
pm July 24 at Tim’s house (1223).
The meeting adjourned at 8:50 pm.
Respectfully submitted,
Tim Schick, Secretary